No | Project Name | Location | Amount | Status |
---|---|---|---|---|
1 | Geotechnical investigation for Zimbili and Ulongoni Bridge foundation design as part of DMDP Package 6 project.
Main Contractor: Nyanza Road Works Ltd, Tanzania. Consultant: UWP Consultants - JMK CONSULT JV Description of sub contracted works: Construction of three box culverts along Zimbili Road which consisted of 1 – Cell (2m x 1.5m), 2 – Cell (2m x 2m) and 3 – Cell (2m x 2.5m) Box culvert. |
Ilala Municipal Council | TZS. 78.0 Millions | Completed |
2 | Construction of Three Box Culvert on Zimbili Road, part of the DMDP Package 6 project.
Main Contractor: Nyanza Road Works Ltd, Tanzania. Consultant: UWP Consultants - JMK CONSULT JV Description of sub contracted works: Construction of three box culverts along Zimbili Road which consisted of 1 – Cell (2m x 1.5m), 2 – Cell (2m x 2m) and 3 – Cell (2m x 2.5m) Box culvert. |
Ilala Municipal Council | TZS. 212 Millions | Completed |
3 | Construction of Access Road to a New Radar site.
Main Contractor: THALES/BREEZTEK OF FRANCE Consultant: TBA/JMK CONSULT Description of sub contracted works: Construction of 150 m Access Road to a New Radar by doing site clearance, Top soil removal, Roadbed preparations, construction of Subgrade, Subbase and CRR base course including drainage structures line crossing culverts and side drains. |
TANZANIA CIVIL AVIATION AUTHORITY - TCIA | TZS. 71.28 Millions | Completed |
4 | Routine/Recurrent Maintenance on Mwanga–Kikweni–Vuchama (Unpaved), Mwanga – Kikweni – Vuchama (Paved), Kikweni – Usangi/Lomwe (Unpaved)and Periodic Maintenance on Mwanga – Kikweni-Vuchana (Unpaved) Roads
Main Contractor: Chafils Company Ltd Consultant: Tanroads Description of sub contracted works: Routine, Recurrent and Periodic maintenance of regional roads. |
Tanroads - Kilimanjaro Region | TZS 148 Millions | Completed |
5 | Bridge Major Repair of Mumbulu VI Bridge Along Mkungu – Nanganga Roads
Main Contractor: Chafils Company Ltd Consultant: Tanroads Description of sub contracted works: Construction of 2 Box Culverts and river training. |
Tanroads - Mtwara Region | TZS 198 Millions | Completed |
6 | Construction of Materials Storage Warehouse at Kinyerezi II Power Plant.
Main Contractor: CSI Electrical Ltd Consultant: Toshiba Japan Description of sub contracted works: The project was comprising of construction of RCC foundation and slab on grade and erection of prefabricated steel structure frame and steel sheets roof and wall cladding. Including materials storage racks. |
Toshiba | TZS 96.6 Millions | Completed |
7 | Construction of Accommodation Camp for Toshiba Staff for Kinyerezi II Power Plant at Kinyerezi.
Main Contractor: CSI Electrical Ltd Consultant: Toshiba Japan Description of sub contracted works: All Civil works comprising of construction of RCC foundation and slab on grade and assembly and erection of prefabricated Container compartment, including water supply and wastewater disposal system; car park, overhead water tank and landscaping. |
Toshiba | TZS 142.6 Millions | Completed |
8 | Construction of Site Office Accommodation for CSI Electrical at Kinyerezi II Power Plant.
Main Contractor: Chafils Company Ltd Consultant: CSI Electrical Ltd Description of sub contracted works: All Civil works comprising of construction of RCC foundation and slab on grade and assembly and erection of prefabricated Container compartment, including water supply and wastewater disposal system; car park, overhead water tank and landscaping. |
CSI Electrical Ltd | TZS 362.7 Millions | Completed |
9 | Design and Build of Double Seal Bitumen standard Access road to Mazizi Hill in Chalinze District (600 Metres).
Main Contractor: Overseas Infrastructure Alliance (Pty) India Consultant: WAPCOS Consulting Engineers Description of sub contracted works: Topographic survey, geometric design, pavement design and drainage structures design. We also did bush clearance and earthworks, pavement construction and surfacing. Managing construction materials testing, control laboratory for the project; |
CSI Electrical Ltd | TZS 590 Millions | Completed |
10 | Periodic Maintenance of Gravel Roads in Rombo District.
Main Contractor: Chafils Company Ltd Consultant: Rombo District Engineer Description of sub contracted works: The project works included light grading and heavy reshaping, De-silting drainage structures and construction of new pipe culverts and mitre drains. |
Rombo District Council | TZS 51 Millions | Completed |
11 | Periodic and Routine Maintenance of Gravel Roads in Mtwara District.
Main Contractor: Chafils Company Ltd Consultant: Mtwara District Engineer Description of sub contracted works: The project works included light grading and heavy reshaping, De-silting drainage structures and construction of new pipe culverts and mitre drains. |
Mtwara District Council | TZS 49 Millions | Completed |
12 | Project for the construction of One stop boarder post complex building and associated civil works at HOLILI BOARDER POST.
Main Contractor: DB Shapriya Ltd Consultant: Sai Consulting Engineers Description of sub contracted works: All Civil works comprising of construction of the transit trucks parking bay; kerbing and paved walkways construction works and drainage system construction works; Managing the concrete batcher plant; precast yard and the Quality Control Laboratory for the project; |
Tanzania Revenue Authority (TRA) | TZS 250 Millions | Completed |
13 | Project for the construction of One stop boarder post complex building and associated civil works at SIRARI BOARDER POST.
Main Contractor: Humphrey Constructions Ltd Consultant: Sai Consulting Engineers Description of sub contracted works: All Civil works comprising of construction of the transit trucks parking bay; kerbing and paved walkways construction works and drainage system construction works; Managing the concrete batcher plant; precast yard and the Quality Control Laboratory for the project; |
Tanzania Revenue Authority (TRA) | TZS 320 Millions | Completed |
14 | Repair works of part of the Central Railway line at the section between Kilosa Station in Morogoro Region and Gulwe in Dodoma Region.
Main Contractor: CECC Consultant: Chief Civil Engineer TRL Description of sub contracted works: Retaining works of the Mkondoa River flood plain to protect railway track embankment. |
Tanzania Railways Limited (TRL) | TZS 190 Millions | Completed |
15 | Provision of infrastructure facilities and utility services for the Njedengwa Investment area in Dodoma Municipality
Main Contractor: Nyanza Road works Ltd Consultant: CDA - Directorate of Engineering and Construction Description of sub contracted works: Clearing and grabbing works, grading and shaping works for the project access roads as an initial stage of constructing bituminous service roads. |
Capital Development Authority (CDA) | TZS 75 Millions | Completed |
16 | Construction of Drainage structures for Upgrading of Wete –Gando and Wete – Konde Roads project in Pemba Island in Zanzibar.
Main Contractor: MECCO Ltd Consultant: J. Burrow (pty) Ltd of South Africa Description of sub contracted works: Construction of pipe culverts, stone pitching, side drains and erosion checks. |
Ministry of Infrastructure and Communication, Zanzibar. | TZS 98 Millions | Completed |
17 | Construction of Lukuledi III Bridge at Mtama, Lindi.
Main Contractor: Southern Highland Ltd Consultant: Apex Engineering in Association NIB Consult Description of sub contracted works: Assembling and erection of steel structure beams and cross members. |
Regional Manager - TANROADS, Lindi. | TZS 27 Millions | Completed |
18 | Construction of Office Extension and Boundary wall for the Immigration Department in Zanzibar.
Main Contractor: Chafils Company Ltd Consultant: Facilities Engineer Description of sub contracted works: Excavation and placing strip foundation base concrete, Erection of concrete columns and solid block walls, plastering and painting including the two office rooms, guard house and toilets. |
Immigration Department | TZS 100 Millions | Completed |
19 | Construction of Materials Storage Warehouse at Kinyerezi II Power Plant.
Main Contractor: CSI Electrical Ltd Consultant: Toshiba Japan Description of sub contracted works: The project was comprising of construction of RCC foundation and slab on grade and erection of prefabricated steel structure frame and steel sheets roof and wall cladding. Including materials storage racks. |
Toshiba | TZS 96.6 Millions | Completed |
20 | Construction of Access Road to a New Radar site.
Main Contractor: THALES/BREEZTEK OF FRANCE Consultant: TBA/JMK CONSULT Description of sub contracted works: Construction of 150 m Access Road to a New Radar by doing site clearance, Top soil removal, Roadbed preparations, construction of Subgrade, Subbase and CRR base course including drainage structures line crossing culverts and side drains. |
TANZANIA CIVIL AVIATION AUTHORITY - TCIA | TZS. 71.28 Millions | Completed |
21 | Design and Build of Double Seal Bitumen standard Access road to Mazizi Hill in Chalinze District (600 Metres).
Main Contractor: Overseas Infrastructure Alliance (Pty) India Consultant: WAPCOS Consulting Engineers Description of sub contracted works: Topographic survey, geometric design, pavement design and drainage structures design. We also did bush clearance and earthworks, pavement construction and surfacing. Managing construction materials testing, control laboratory for the project; |
CSI Electrical Ltd | TZS 590 Millions | Completed |
We take on roles of main contractor for small to medium size projects and performs construction works and project management services to coordinate specialist trades for transportation, industrial and commercial projects.
+255784677969, +255717708279
Ubungo District, Manzese Darajani area, along Morogoro Road on Plot No.61/1-2 Block B, Faberk House.
Postal Address:-
P.O Box 11678,
Dar es Salaam,
Tanzania.
©2020 Chafils Company Limited. All rights reserved